Project Name: Office Building Project of Liming Village, Litong District, Wuzhong City Progress phase: construction preparation Construction period: 2011-2012 The total investment of the project is unknown Construction Unit: Liming Village Committee, Licheng District, Wuzhong City Postal address: Liming Village Committee Office Building, Gucheng Town Post code: 751000 2 Ton Electric Stacker With High Mast
Electric Stacker, or walkie stacker, is an
industrial device for loading and lifting pallets on a shelf at high level. The electric stacker with high mast can be widely used
in petroleum, chemical, pharmaceutical, textile, pigment, coal and other industries,
as well as ports, railways, freight yards, warehouses.
Compared with the traditional manual stacking,
Zowell full electric stacker maintains great advantages in safety, efficiency
and cost. In addition to durability and accuracy both outside and inside,
Zowell XE electric stackers are also equipped with mast with clear view, double
speed and lateral vertical moving switch, which are valuable when working in
limited space.
The load capacity of XEH20A is 2000kg, it has two driving modes: walking and standing driving. If
you need bigger capacity or other customized options such as rod, low mast,
grabbling frame, please contact us so that we can provide you best solution
with professional knowledge.
Suzhou
Pioneer Material Handling Equipment & Technology Co., LTD was established
in 2005. The factory is located in Suzhou Wuzhong district, Xujiang industrial
park.Zowell is the English trademark and its Chinese trademark is pronounced
zhuoyi. The company is a national high-tech enterprise which has been awarded
the the title of national intellectual property superiority enterprise and it
has its own Suzhou engineering technology research and development center.
High mast electric stacker,Baoli electric stacker,Battery for electric stacker,Best electric pallet stacker,Best electric stacker Suzhou Pioneer Material Handling Equipment & Technology Co., Ltd , https://www.xianfengforklifts.com
Major equipment: cranes, firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities (for reference only)
Project Profile: The project is located north of Shengli West Street, west of planned road, south of Zaoyuan Road, about 5800m2.
Contact: Mr. Ma Telephone
Wuzhong Litong District Liming Village Office Building Project
The office building project of Liming Village, Litong District, Wuzhong City (2011-2012)
Related Developments: Tower Crane Infrastructure Project