Mine name Deposit element Production capacity of 10,000 tons / year Mainly develop roadway location Main level Slip Auxiliary vertical (oblique) well Note Going long (m) Extension (m) inclination (°) Thickness (m) Number of pieces Section Length (m) Number of pieces Section Length (m) Number of pieces Section (m 2 ) Length (m) Qijiang Whitehead Lake iron ore 400~ 900 1100 33~ 36 0.7~ 2.97 10.5 Lower plate 1 Width × height 2.6 × 2.75m 1039.4 Inclined well 3 4.93 5.34 420 453 400 1 upper inclined well and 2 middle inclined wells Minjiang Daloba Iron Mine 1000 600 18~ twenty two 2.0 25.5 Intrapulse 1 Double Lane: 3.78 208 1 inclined well 5.64 621 Tianhu Iron Mine Zhaojiazhong Mining Area 200~ 1000 202 40 1.69 10 Lower plate 1 inclined well 8.57 400 Pangjiabao Iron Mine 8600 Vertical depth 350 25~ 35 I layer mine 1.87; 250 Lower plate The first section of the second section of the third section of the third section of the slippery well 22~ 2.5m 2×2m 270 270 270 Three sections Two paragraphs One blind oblique well two blind oblique well three blind oblique well four blind oblique well five blind oblique well 446 422 416 533 Three-stage slide II layer mine 1.35 On the plate 1 13.0 m 2 1860 III layer mine 0.8 Lower plate 1 12.68 m 2 5100 Xiangdong Qingshui Iron Mine 3400 800 25~ 75 1.51 20 flank 1 7.09 m 2 4256 1 1.8×2m 62 1 5.06 150 The main flat and the water mine share Longquan lead zinc ore 350 0~ 42 4.0~ 43. 9 average 16.54 13.2 Lower plate 1 5.58m 2 9.89m 2 394. 32 1 2.52.5 m 140 Ground roads are connected to the middle section of the mouth Shizhuyuan metal ore 600~ 980 About 300 10~ 15 100~ 200 thickest 300 99 Lower plate 1 12.03 m 2 14.73 m 2 2081 twenty four 4 33m Two 110 Two 178 a ramp 11.22 1176 Wuchuan mercury mines 2700 ~ 4300 400 10~ 25 45~ 80 0.31 ~ 12.35 6.6 Lower plate 1 5.6m 2 1010 3 2.52.5 m 170 55 130 Is expanding to 132,000 tons / year Tin Tieshan Lead-Zinc Mine 850~ 1365 628 60~ 80 4~16 100 Lower plate 1 13.88 m 2 1050 2 7.07 m 2 160×2 Surface roads pass through all stages Shaanxi Silver Hole silver galena 550 727 30~ 45 4 10 Lower plate 1 5.6m 2 418 1 7.06 m 2 120 Ibid. Shaanxi Yinmu Temple Lead-Zinc Mine 250~ 90 350 73~ 85 3 6.6 Lower plate 1 Net 11m 2 Digging 6.11m 2 391.9 1 12.57 222.7 Kaiyang phosphorus ore 4600 1100 30~ 45 6~7 100 Lower plate 1 11.8 m 2 510 4 7.07 m 2 40 80 160 200 Inclined well 4 4.3 208×4 Hubei Wangji Phosphate Mine 4200 25~ 38 8 150 1st district in the south Central District 1 8.6m 2 8.6~ 9.0m 2 1200 1500 3 3 4.91 m 2 4.91 m 2 90 60 30 90 90 30 Sichuan Jinhe Phosphate Mine 2300 500 8~ 23 6~10 50 1 8.55 m 2 395 2 3.14 m 2 4m 2 35 69 Surface ramp Inner Mongolia charcoal kiln pyrite 1770 500 56 6.64 50 1 8.2~ 12.5m 2 1460 3 4.8 m 2 100 741-1 2100 300 60~ 70 1~2 8 Lower plate 1 4.77 m 2 650 1 44m 209 743-1 500 250 65~ 80 1~ 1.5 3 Along the way down 1 6.05 m 2 370 1 5.59 150 Pine tree tin mine 245~ 910 220~ 450 10~ 15 2~ 10 49.5 Lower plate 1 5.07~ 10.78 m 2 2397 4 2.32.3 m 175~ 200 2 4.14.1 ~ 4.6m 191~ 219m Dongchuan Mining Bureau 1000 ~ 1500 1500 ~ 1944 15~ 18 2.4~ 4.1 26.4 Lower plate 1 2.65~ 2.6m 2 1440 6 2.32.3 m 20~ 150 1 2.5×3.5m 197 Easy Gate Lion Copper Mine 30~ 325 20~ 600 64~ 82 1~ 30.9 59.4 Lower plate 1 5.86~ 6.04 m 2 1443 (single length) 1 2.52.5 ~3.5 m 293 1 4.24.2 m 260 Yimen Shishan Mine 680~ 900 600 60~ 25 18~ 22 69.3 Lower plate 1 5.31~ 11.81 m 2 2089 2 2.02.0 m 100~ 150 1 5.55.5 m 250
A substance used in small quantities to increase the rate of reaction when used with a Catalyst. Commonly used accelerators are DMP-30, triethanolamine, BDMA, CT-152x, DBU, EP-184 and so on. Our promoter variety complete, stable performance, after sale worrieless, welcome to order
Jiangyin Qian Chemical Co., Ltd. is a
professional one-stop composite problem solver, production and
processing of Unsaturated Polyester Resin, vinyl Resin , Epoxy Resin,
gelcoat resin, glass fiber, curing agent, accelerator, color paste,
stripping wax and other composite products, products have been sold all
over the country and exported to dozens of overseas countries and
regions.
Accelerant,Accelerator,The Accelerator,Hyper Accelerator Jiangyin Thousands Chemicals Co. , https://www.jywqhxcomposite.com
Henderson molybdenum mine heavy truck uphill flat development example
The Henderson Molybdenum Mine is a large-scale mine that was completed and put into operation in the United States in the 1970s. It is a mining and mining enterprise with a daily output of 27,000 tons of ore.
The deposit has a length of 900m, a thickness of 120-240m, and an average grade of MoS 2 of 0.49%.
Mining terrain, due to large-scale beneficiation plant, there is not enough industrial sites near the mine, processing plant had built in place across the Atlantic from the Pacific watershed of mine 22.5km. The elevation of the plant is 2,743m, and the elevation of the main flat shaft is 2,286m, so it can only be transported uphill by Changping.
The main flat ore transport layer considers two options: one is rail transport; the other is belt conveyor transport. Compared with the scheme, the latter has a transportation cost higher than the former by US$0.02/ton; and an underground crushing and dust removal device is required; the flat section has a large section, and in addition to the steel rope conveyor, the auxiliary vehicle is also required. It was therefore decided to use rail transport. A double track with a gauge of 1040 mm is laid in the flat. It is 5m wide, 4.6m high and 15.8km long (Fig. 1).
Figure 1 Henderson molybdenum mine flat development system diagram
1-outlet well; 2-second well; 3-intake well; 4-wind well;
5-ç¡å£; 6-concentration plant; 7-train group
A total of three shafts were drilled in the mine. Well No. 1 was an outflow well, and No. 3 was an inlet well with an internal diameter of 7 m. Both wells were drilled to a level of 2469m, with a depth of 744m and 698m respectively. Well 2 is used to upgrade personnel, equipment and materials. The net diameter of the wellbore is 8.5m and the depth of the well is 946m. Connected with the 2286m main level. There are 114-person double-layer cages in the wellbore and a large cage with a load of 20t and a bottom area of ​​7.3×2.7m for lifting large-scale equipment such as dump trucks and scrapers. Both cages are equipped with counterweights. There is also a small cage for wellbore maintenance. Each stage is connected by a ramp.
  Â
The main level boring is divided into two working faces to perform relative operations. The west section is 11km long and is driven downhill from the surface to the east with trackless equipment. The eastern section is 4.8km long and is used to dig up the west uphill with rail equipment.
  Â
Due to the high ground temperature (37°~42°C), in order to improve the ventilation conditions, a No. 4 well with a diameter of 4.3m and a depth of 483m was drilled in the middle of the main flat, and two 370kw fan fans were installed at the wellhead.
See Table 1 for examples of Pingyi development.