Luxury Printing Packaging Gift Box Luxury Printing Packaging Gift Box is one of our main products, "details oriented quality product, on-time delivery and efficient customer service" are always our goals. Luxury Printing Packaging Gift Box,Luxury Jewelry Packaging Gift Box,Packaging Gift Box With Logo Printing,Luxury Design Printed Packaging Box Guangzhou Mingyin Packaging Trading Co.,Ltd. , https://www.mypaperpackages.com
In the construction of mining engineering projects, in addition to the usual contents of other expenses, the following items should be specially noted:
2. Geological disaster prevention and control fees: refers to the costs incurred in the restoration and control of the geological environment of the mine and the prevention and control of geological disasters.
3. Wellbore geological inspection Drilling fee: refers to the drilling cost required for the geological and hydrological conditions of the location of the wellbore before the construction of the wellbore.
4. Exploration rights transfer fee: refers to the cost of the construction unit to pay all the technical data of the intensive investigation, detailed investigation (final), census (final), expansion and extension, supplementary exploration, mining water source exploration and supplementary seismic exploration.
5. Maintenance fee: refers to the maintenance cost of the underground construction of the bolting and spraying support roadway, the wooden support roadway and the industrial building permanent construction project and the external road after the completion of the transfer to the production, and the use of the construction unit and the escrow period.
6. Mine well level determination fee: refers to the cost of measurement, standard pile infusion.
We have over ten year experience making the paper box, our clients are over the world.
The size, color, material and logo could be customized according to your requires.
Such as magnetic gift box,paper box printing.
Mining project investment composition and other expenses
The project cost of the mining project consists of construction and installation engineering fees, equipment and equipment purchase costs, other construction costs and reserve fees. Mining project investment generally includes the contents (pictured)
(1) Generality projects
Environmental impact assessment fee, safety production evaluation fee, etc.
(2) Professional projects
1. Mining rights transfer fee: refers to the mining use fee, mining right price, mineral resource compensation fee and resource tax paid by the mining right.