·Jingkai Expressway and Southwest Third Ring Road will increase more than 100 traffic monitoring equipment

Today, the bus lanes of Jingkai Expressway and Southwest Third Ring Road will be officially opened. In response to the phenomenon that social vehicles may have occupied the bus lane after the opening, the traffic control department added 9 sets of fixed monitoring equipment and more than 100 sets of mobile mobile monitoring equipment on the basis of more than 10 sets of traffic violation monitoring equipment. The traffic police will also be on the road. Conduct more on-site law enforcement.
According to reports, the special road section of the Jingkai Expressway is the main road west of the Xihongmen Toll Station to the south of the Caihuying Bridge. The length of the section is 7.8 kilometers. The southwestern three-ring special road is set on the main road side, and the section of the road is from Yuquanying Bridge West to Xinxing Bridge South. The length of the road section is 8.6 kilometers. The Jingkai Expressway special road is used by the tides. The morning peak (7:00-9:00) is used to activate the direction of the road, and the evening peak (17:00-19:00) is used to drive out of the city; the southwestern ring of Yuquanying Bridge to the Xinxing Bridge The south bus lane is open for both the morning peak (7:00-9:00) and the evening peak (17:00-19:00).

COMMERCIAL AIR SOURCE HEAT PUMPS

Commercial Air Source Heat Pumps,Toilet Water Heater,Heat Pump For Heating Evi,30Kw Heat Pump

Newfair Eco-Energy(Guangdong) Co.,Limited , https://www.newfairecoenergy.com