The soft curtain quick cold storage door has a simple design and is designed with a heating antifreeze device to ensure smooth and efficient operation of the product in a low temperature working environment. The structure incorporates the function design of collision avoidance recovery. When the door body is accidentally impacted, it deviates from the track and automatically repairs the return position during the ascent process. This structure not only facilitates the safe and smooth operation of the door body, but also operates more than 150,000 times a year without failure. It extends the life of the product while reducing component replacement and maintenance costs.
Such rapid door is specially designed for freezer, cold room, or cool room. It is made from 30 mm thick thermal insulated,sandwich curtain, and with all-round heating device to avoid frozen. Thus it can work well in low temperature like -25 º C. It can reduce thermal transmission by fast opening and closing, and thermal insulated door curtain. For each door, it can help customer save energy cost by at least USD 8000 every year,than traditional normal speed cold room sliding doors.
Cold Storage High Speed Door, high speed freezer doors, cold store doors, cold storage zipper doors, industrial freezer doors SHENZHEN HONGFA AUTOMATIC DOOR CO., LTD , https://www.hongfarrs.com
Prev: Foreign thermonuclear experimental reactors enter a decisive stage
Mudi Power Plant Suppresses Large and Small Expansion Projects
Mudi Power Plant Shangda Big-Pressure and Small-Scale Expansion Project Progresses Diesel Generator | Diesel Generator Price / 2010-07-30
It was reported that since the commencement of construction of the "Shangmao Small Pressing" expansion project of Huadian Energy's Mudanjiang No. 2 Power Plant, it has been firmly focused on the project objectives of "a beautiful environment, high-quality engineering, high-efficiency operation, and three production standards for efficiency, efficiency and efficiency." The construction of the project was promoted, and the power-receiving of #8 and #9 machineries was successively successful, the hydraulic pressure tests of #8 and #9 boilers were successful once, and the mileage of the #8 and #9 steam turbines was once successful. At present, it has successfully entered the final stage.
During the construction of the project, the plant accurately grasped the four basic control points of “safety, quality, construction period, and cost†and carefully carried out nine tasks, laying a foundation for the orderly development of the project and ensuring the realization of the goal of “two excellent and one high threeâ€. The foundation. The first is to strengthen safety management and strengthen the safety foundation through activities such as "three actions," "three constructions," and "safety risk investigation and management," and second, continuous improvement and strict implementation of engineering excellence planning, safe and civilized construction planning, etc. The plan and various rules and regulations; The third is to prepare a "comprehensive compilation of prevention and control measures for typical quality problems" in light of the actual situation of the project, and provide guarantees for the safe and stable operation of the units after they are put into operation. Fourth, the cooling tower is based on the theme of scientific and technological innovation and energy saving and emission reduction optimization design. The engineering foundation replacement, the optimization of the heating network system in the plant and the optimization of steam turbine steam turbines have been optimized. A number of indicators groups have been set up to lay the foundation for energy conservation and consumption reduction after the project is put into operation. Fifth is to strengthen the management and control of project quality. Implement quality management measures and strive to improve project quality; Sixth, strengthen the supervision of commissioning and trial operation quality and advance preparations for production; 7. Strengthen the management of tenders, contracts, and benchmarks, and comprehensively promote the application of PMIS systems, and effectively improve project management The efficiency and overall level of work; eight is to carry out engineering construction The special issue management work was highlighted, and the foundation was further improved to further improve the quality of the “large and small†expansion project and improve the management transparency and management level of the engineering construction field. Nine is to actively implement supporting projects and improve the completeness of project transfer. At present, plant greening and building decoration work are also in progress.
Next:Installation, use and regulation of marine diesel generator sets